Skip to main content
ASX Announcements

September 2010 Quarterly Report

By October 29, 2010November 4th, 2020No Comments

The Company reported encouraging exploration results from the Mata da Corda Phosphate Project (“MCPP”), these included:

  • Discovery of high grade phosphate in surface rock chips with grades of 23.1% and 18.6% P2O5 at the Breccia Target located 3 kilometres to the west of Capacete
  • Discovery of the Block 5 Target , where surface sampling results returned up to 13.01% P2O5.
  • Scout mapping of Blocks 5, 6 and 10 identified similar rocks as found at the Capacete Target to the east, with very promising thicknesses and strike lengths in excess of 50 kilometres.
  • These new discoveries highlight the area’s potential to host a near surface phosphate deposit and will be drill tested in December quarter.
  • First bulk sample (16kg) taken from Capacete Target returned excellent mineralogical results and grade of 18.2% P2O5. Results indicate Capacete target amenable to beneficiation which has significant advantages for downstream development of beneficiated phosphate rock and fertiliser production.
  • Completed a 1,000 metre (16 holes) diamond drilling program at the Capacete and Breccia Target with results pending.
  • Reconnaissance ground checking over large 300,000 hectare groundholding continues with the Company expecting results progressively over the coming months.
Loader Loading...
EAD Logo Taking too long?
Reload Reload document
| Open Open in new tab

Download